Skip to content
Work with us |
EN / ES
AMG LOGISTICS
— The corridor

Why Nogales is the most strategic corridor in western Mexico.

Approximately 30% of the vegetables consumed by the United States in winter cross through Nogales. It is the most active commercial port of entry in western Mexico.

— Context

The corridor, in numbers.

Nogales connects the agricultural production system of Sinaloa, Sonora and Baja California with the markets of Phoenix, Los Angeles and the southern United States. It is the most important land port of entry in western Mexico and the second most active in the country by trade volume.

The corridor is not just a line. It is a system that includes two ports of entry (Mariposa commercial, DeConcini mixed), a strategic bonded warehouse, IMMEX operations in Nogales Sonora, and a regional hub in Hermosillo that acts as a consolidator for export shipments.

— Distances

Real transit times in the corridor.

Estimated transit times excluding the border crossing. Average crossing at Mariposa ranges between 3 and 6 hours depending on shift, season and protocol.

Route
Distance
Time
Nogales Phoenix
262 km
3 h
Hermosillo Nogales
282 km
3.5 h
Hermosillo Phoenix
544 km
6.5 h
Guadalajara Hermosillo
1,416 km
17 h
Guadalajara Nogales
1,698 km
20.5 h
Guadalajara Phoenix
1,960 km
23.5 h
CDMX Nogales
2,050 km
25 h
Nogales Los Angeles
890 km
9.5 h
— The two ports of entry

Mariposa and DeConcini
are not interchangeable.

Cola de tractocamiones en la garita comercial Mariposa al atardecer
Commercial port

Mariposa

Commercial port of entry dedicated to heavy freight and trucks. Operates 24/7 with FDA and CBP inspection. Optimal window: night shift for perishable freight bound for Phoenix.

Hours
24 hours
Type
Commercial freight FTL/LTL
Average crossing
3 – 6 h
Mixed port

DeConcini

Pedestrian and passenger port with limited lanes for light freight. Does not handle commercial trucks. Useful for document urgencies and express movement of samples.

Hours
24 hours
Type
Pedestrian · passenger · light
Average crossing
20 min – 2 h
— Get started

Let's build the next
bridge together.

Our team will reach out with a custom proposal in less than 8 business hours. It includes route analysis, estimated transit times and a closed-quote price.